Henry ChanHenry ChanS-637957

West Kowloon · Kowloon Station · Development Guide

West Kowloon:
Where do the major projects stand?

A housing proposal, a mall above the high-speed rail station and a waterfront office development: here’s where each stands.

Compiled 2026-09-16 | Some information updated through 2026-07-29

At a glance

Three major West Kowloon projects

The housing proposal, International Gateway Centre and Artist Square Towers are separate projects at different stages.

Image for reference only
Kowloon Station, International Gateway Centre (IGC), Hong Kong West Kowloon Station and Austin Station, with Victoria Harbour and Hong Kong Island in the distance.
Planning application stage

West Kowloon housing proposal

The West Kowloon Cultural District Authority proposes seven residential towers with no more than 1,995 flats. This reflects the January 2025 briefing. See the Authority’s announcements for the Town Planning Board decision and sales arrangements.

Completed; opening in phases

International Gateway Centre

Sun Hung Kai Properties’ commercial development above Hong Kong West Kowloon Station comprises four towers with about 2.5 million sq ft of Grade A offices. The mall is named Stage IGC, with a first-phase soft opening expected in late 2026.

Under construction; expected in 2027

Artist Square Towers

Sun Hung Kai Properties is developing three waterfront office towers under a build-operate-transfer (BOT) arrangement. JPMorgan Chase has committed to leasing about 250,000 sq ft.

International Gateway Centre and Artist Square Towers are commercial office and retail projects, not residential properties or listings I represent. The West Kowloon housing proposal remains at the planning application stage. If quoting it, please note that it is subject to the latest announcements from the West Kowloon Cultural District Authority and the Town Planning Board.

Location and connections

Rail, high-speed trains and roads in one area

Hong Kong West Kowloon Station is Hong Kong’s only high-speed rail station and the terminus of the Hong Kong section of the Guangzhou–Shenzhen–Hong Kong Express Rail Link. Nearby are Kowloon Station (Tung Chung Line and Airport Express) and Austin Station (Tuen Ma Line). All times below are approximate.

About 14 minHigh-speed rail to Futian, Shenzhen (fastest service)
About 47 minHigh-speed rail to Guangzhou South (fastest service)
About 22 minAirport Express from Kowloon Station to the airport
About 5–10 minWalk to the high-speed rail station from Austin or Kowloon Station
DestinationRouteApprox. timeNotes
Futian, ShenzhenHigh-speed railAbout 14 minFastest service; varies by train
Guangzhou SouthHigh-speed railAbout 47 minFastest service; varies by train
Hong Kong International AirportAirport Express (Kowloon Station)About 22 minTrains run about every 10 minutes
Tung ChungTung Chung Line (Kowloon Station)DirectSame station as Airport Express
Central (Hong Kong Station)Tung Chung Line or Airport Express (Kowloon Station)DirectCheck MTR for current times
East Tsim Sha Tsui, Hung HomTuen Ma Line (Austin Station)Tuen Ma Line towards Hung HomEast Tsim Sha Tsui is the next stop; trains run about every 3–7 minutes
Kai TakCentral Kowloon Bypass (Yau Ma Tei Interchange to Kai Tak)Depends on trafficKai Tak is between Yau Ma Tei and Kowloon Bay; the full Yau Ma Tei–Kowloon Bay trip takes about 5 minutes at peak times
Yau Ma Tei to Kowloon BayCentral Kowloon BypassAbout 5 min at peak timesGovernment estimate, down from about 30 min
Kai Tak StationTuen Ma Line (Austin Station)DirectSee the Kai Tak guide
Open to traffic

Central Kowloon Bypass (Yau Ma Tei Section)

Formerly the Central Kowloon Route, this section opened at 10 am on Sunday, 21 December 2025. About 4.7 km long, it links Yau Ma Tei Interchange in the west with Kai Tak Interchange and the Kowloon Bay road network in the east. The Transport Department estimated that peak-hour journeys from Yau Ma Tei to Kowloon Bay would fall from about 30 minutes to about 5 minutes. The Yau Ma Tei section was initially toll-free.

Expected 2026-12-06

Full opening of Route 6

The Kowloon Bay section of the Central Kowloon Bypass is expected to open on 6 December. The Civil Engineering and Development Department estimates about 12 minutes from Tseung Kwan O town centre to Yau Ma Tei at peak times, down from about 65 minutes. From the full opening, a flat HK$8 toll applies to all vehicles at all hours, with the toll point at the Kai Tak end.

Sources for the Central Kowloon Bypass (Yau Ma Tei Section) opening: announcements from the Highways Department and the Civil Engineering and Development Department; Sing Tao Daily (2025-12-17). See the Transport Department’s latest announcements for toll arrangements after opening.

These times are for reference only and depend on services, transfers and traffic. Check the latest announcements from MTR, the high-speed rail operator, the Transport Department and the Civil Engineering and Development Department.

Housing

Proposed residential development

Based on the West Kowloon Cultural District Authority’s briefing to the Yau Tsim Mong District Council (2025-01-09).

Image for reference only
Completed, under-construction and planned projects in the West Kowloon Cultural District, and the proposed housing area (purple). Source: West Kowloon Cultural District Authority, Section 16 planning application documents. For reference only; the indicative layout is subject to detailed design.
Image for reference only
West Kowloon pedestrian network: public passageways, all-weather walkways and the waterfront promenade. Source: West Kowloon Cultural District Authority, Section 16 planning application documents (concept drawing for reference only).
ItemProposal
Site areaAbout 19,999 sq m
Gross floor areaUp to 134,500 sq m
Residential floor areaUp to 108,500 sq m
Retail, dining and leisureUp to 26,000 sq m
Residential towers7 towers
Residential flatsUp to 1,995 flats
Building height84–100 m above Principal Datum
LocationSouth of Austin Road West and north of the planned boulevard
  1. July 2024 The Executive Council lifted the requirement to develop residential space in West Kowloon Zone 2 exclusively under the build-operate-transfer model. It allowed sales up to the 2014 approved cap of 170,280 sq m of residential gross floor area.
  2. 29 November 2024 The Authority consulted a Harbourfront Commission task force, which supported the proposal.
  3. Q1 2025 (planned) Submit an application for planning permission to the Town Planning Board.
  4. Later See the Authority’s announcements for the Town Planning Board decision and sales arrangements.

The application does not change the residential gross floor area cap or height limits approved by the Town Planning Board in 2014. The Authority says technical assessments indicate the proposal is feasible, but it remains at the application stage and no listings have been confirmed.

Feel free to contact me for the latest on new homes in West Kowloon or to ask about a particular development.Enquire on WhatsApp Call 5741-0580

International Gateway Centre · Stage IGC

A financial and retail hub above the high-speed rail station

About 2.5m sq ftGrade A offices
About 620,000 sq ftRetail space
Over 8m sq ftGross floor area including related nearby developments
End of 2026Stage IGC phase-one soft opening
Image for reference only
International Gateway Centre (IGC): four towers above Hong Kong West Kowloon Station.
Image for reference only
Kowloon Station area: International Commerce Centre, residential estates and the landscaped podium at ELEMENTS.

Designed by Zaha Hadid Architects, the development sits above Hong Kong West Kowloon Station and connects to Kowloon Station on the Airport Express. Confirmed tenants include UBS, Santander, Ping An Bank, Rabobank, China Construction Bank (Asia), AXA, AIA and FWD, as reported through 2026-07-24.

Stage IGCDetails
Number of floors5 floors
Gross floor areaOver 600,000 sq ft, around 240 tenants
First phaseAbout 80,000 sq ft on the ground floor, with around 40 shop units themed around Hong Kong food.
Opening scheduleSoft opening at the end of 2026; full opening in Q3 2027.
Dining and retail mixAbout 30% dining and 70% retail
Car park543 spaces, all equipped with medium-speed charging
TransportReported connections to Airport Express, Tung Chung Line and Tuen Ma Line.

Artist Square Towers

Three waterfront office towers in the cultural district

2022-11Sun Hung Kai Properties wins BOT development rights
About 672,000 sq ftGross office floor area
About 27,000 sq ftRetail space
2027Expected completion

The East and West Towers are connected across the top eight floors. JPMorgan Chase has agreed to lease six connected floors across both towers for 10 years, covering about 250,000 sq ft, or nearly 40% of the project’s gross office floor area. Public reporting has not yet identified other confirmed tenants.

Cultural district

What’s already in the West Kowloon Cultural District

About 40 haTotal site area, including 23 ha of public space
Nearly 4.4mVisits to arts and cultural venues in 2023/24
15th worldwideM+’s 2023 ranking (The Art Newspaper)
96%–100%Utilisation rate of major performing arts venues
Image for reference only
The Art Park waterfront lawn, looking across to Hong Kong Island.
Image for reference only
Tsim Sha Tsui waterfront and Victoria Harbour from above West Kowloon, with local construction sites in the foreground.
Image for reference only
Tsim Sha Tsui and Victoria Harbour from above Kowloon Park, with Hong Kong Island across the water.

Open: Hong Kong Palace Museum, M+, Xiqu Centre, Art Park, Freespace and the Art Pavilion. Under construction: Artist Square Towers, WestK Performing Arts Centre (expected completion in 2026) and the Southern Landing Facility. The timetable for Phase 3 arts and cultural facilities depends on funding.

Timeline

West Kowloon timeline

  1. 2025-01-09 The Authority briefs Yau Tsim Mong District Council on the housing proposal.
  2. End of 2026 Stage IGC phase-one soft opening (about 80,000 sq ft).
  3. 2027 Expected completion of Artist Square Towers.
  4. Q3 2027 Full opening of Stage IGC.
  5. Later See the Authority’s announcements for the Town Planning Board decision and sales arrangements for the West Kowloon housing proposal.

Frequently asked questions

When can I buy a home in the West Kowloon development?

Sales arrangements depend on the Town Planning Board’s decision and the Authority’s announcements.

Are International Gateway Centre and Artist Square Towers the same project?

No. Both are commercial projects by Sun Hung Kai Properties, but International Gateway Centre is above Hong Kong West Kowloon Station, while Artist Square Towers is in the West Kowloon Cultural District.

How do these commercial projects relate to homes near Kowloon Station, Austin, Jordan and Tsim Sha Tsui?

They can help you understand the area’s amenities and commercial facilities, but they don’t predict property prices. Your budget and intended use also matter.

Looking for the right location and price in this area?

Tell me your budget and what you’re looking for. I can pull together information tailored to you beyond what one article can cover.

WhatsApp 5741 0580

Other area guides

Enquire on WhatsAppCall