Three recent developments
Three things to know about Tung Chung now
The key points first, then the details.
Set against Lantau Island’s hills, Tung Chung offers mountain and sea views, natural surroundings and good transport links. Its accessibility appeals to business owners, bankers and investors who travel frequently, as well as commuters who work at Kowloon Station or in Central, people in IT, and local Hong Kong families. Here’s a closer look at the neighbourhood.
I’m Henry Chan, and I run a Facebook group for owners listing their own Tung Chung properties for rent or sale. Tenants, buyers and owners are welcome to join: facebook.com/groups/tungchungproperty
11 SKIES to be handed back early to Airport Authority Hong Kong
New World, Roxy and Airport Authority Hong Kong signed a deed of termination. The proposed handover date is 2027-04-01, and the Authority aims to begin phased operations from 2028/29 in conjunction with SKYTOPIA. Signing the agreement does not mean handover or full opening has already happened. The old opening schedule no longer applies.
Residential sites in Tung Chung East and West
Sites 106A and 106B in Tung Chung East have been awarded. Tung Chung East Station Phase 1 and the Tung Chung Traction Substation development also have developers. The projects have different completion dates.
Rail extensions in 2029–2030
Tung Chung East and Tung Chung West stations are expected to open by the end of 2029, and Siu Ho Wan Station in 2030. Check the latest official announcements for timing.
Tung Chung New Town, Airport City and Siu Ho Wan are separate developments with different developers, sites and schedules.
Location and Links
Tung Chung is a hub for bridge, tunnel and rail links
Tung Chung is near the Hong Kong Port of the Hong Kong–Zhuhai–Macao Bridge and the airport. The Tuen Mun–Chek Lap Kok Tunnel lies to the west, while the Tsing Ma Bridge and Tung Chung Line provide links eastwards to the urban areas. Figures below are approximate.
| Facility | Overview | Notes |
|---|---|---|
| Tuen Mun–Chek Lap Kok Tunnel | The Northern Connection of the Tuen Mun–Chek Lap Kok Link connects Tuen Mun to the Hong Kong Port of the Hong Kong–Zhuhai–Macao Bridge. | Fully opened to traffic in December 2020 |
| Hong Kong–Zhuhai–Macao Bridge | The Hong Kong Port is at Chek Lap Kok; the Southern Connection joins the North Lantau Highway. | The links to and from the urban areas opened on 2018-10-24; the Tung Chung links opened on 2018-11-30. |
| Tsing Ma Bridge | Part of the Lantau Link, a road connection between the airport and the urban areas. | The Tuen Mun–Chek Lap Kok Link can divert traffic from the North Lantau Highway and Lantau Link. |
| Tung Chung Line | Direct trains from Tung Chung Station serve Tsing Yi, Lai King, Nam Cheong, Olympic, Kowloon and Hong Kong stations. | Kowloon Station connects to Hong Kong West Kowloon Station for the High Speed Rail. See the West Kowloon guide. |
| Airport City | Commercial, retail and entertainment development around the airport. 11 SKIES is between Terminal 2 and AsiaWorld-Expo. | See the Airport City section below. |
K11 ATELIER 11 SKIES
Three Grade A office towers with about 570,000 sq ft of total floor area, completed in 2022. They were originally geared towards finance, wealth management and healthcare and wellness services.
11 SKIES retail and entertainment
The original plan called for about 3.8 million sq ft of total floor area, including about 2.66 million sq ft of retail. The early termination agreement was announced on 2026-09-30, with handover to Airport Authority Hong Kong proposed for 2027-04-01. See Latest Developments above for the new arrangements.
For reference only. Driving times depend on traffic. The 11 SKIES floor areas and tenant information come from earlier reports and are affected by the new 2026 arrangements. Check Airport Authority Hong Kong’s latest announcement before citing them.
Walking times by estate
How long does it take to walk to Tung Chung Station?
Tung Chung Station is in the town centre. The farther away you live, the more useful shuttle buses and footbridges become. The walking times below are approximate. Each estate has bus stops very close by.
| Estates | Walk to Tung Chung Station | Notes |
|---|---|---|
| Tung Chung Crescent | About 2–3 min | Closest to Tung Chung Station, with Citygate Outlets nearby |
| Le Bleu Deux | About 7 min | |
| Coastal Skyline | About 7–10 min | |
| Seaview Crescent | About 8 min | |
| La Rossa | About 8–10 min | |
| Le Bleu | About 8 min | |
| Caribbean Coast | About 10–15 min | A footbridge links to Citygate Outlets; the estate also has a shuttle bus. |
| La Mer | About 12 min | |
| Century Link | About 10–15 min | An estate shuttle bus is also available. |
| The Visionary | About 10–15 min | The estate also has a shuttle bus. |
| Yu Tung Court | About 2–3 min |
These are approximate walking times based on Henry Chan’s local experience. Actual times vary with route, weather and walking pace. For reference only.
Shopping and amenities
Shopping and everyday amenities in Tung Chung
Citygate Outlets
The designer outlet mall at 20 Tat Tung Road first opened in 2000 and expanded in 2019. The complex includes Grade A offices and two hotels, has around 1.466 million sq ft of total floor area and more than 190 shops, and is managed by Swire Properties.
Fu Tung Plaza
Near Fu Tung Estate and Tung Chung Station. Its chain supermarket and Fu Tung Market serve residents and airline crew doing their everyday shopping.
Yat Tung Shopping Centre
Managed by Link, the three-storey centre at 8 Yat Tung Street includes Hong Kong Market, open daily from 06:00 to 22:00.
Shops at the base of housing estates
Shops at estates such as Caribbean Coast and Century Link, and Ying Tung Shopping Centre at Ying Tung Estate, cover basic daily needs.
Shops and opening hours can change. For reference only; check each mall’s latest announcements.
Housing Supply
Key housing sites in Tung Chung East and West
These are major projects that have been announced or are at the application stage. Areas refer to buildable floor area; figures are from Lands Department releases and news reports.
| Project | Developer | Units | Key Details | Status |
|---|---|---|---|---|
| Tung Chung East Area 106A (Tung Chung Town Lot No. 54) | Able Best Limited | 985 units | Award price HK$1.627 billion; about HK$3,052 per sq ft of floor area; 6 tenders; buildable floor area about 533,200 sq ft. | Awarded 2026-05-19 |
| Tung Chung East Area 106B (Tung Chung Town Lot No. 55) | Sun Hung Kai Properties | 745 units | Award price about HK$602 million; around HK$1,501 per sq ft of floor area; buildable floor area about 401,100 sq ft. | Awarded February 2025 |
| Tung Chung East Station Phase 1 | Nan Fung | About 600 units (2 towers) | Maximum buildable floor area of about 323,900 sq ft | Tender awarded in late 2024 |
| Tung Chung Traction Substation Property Development | Chinachem Group | 3 residential towers | Total floor area about 939,600 sq ft; land premium about HK$3.55 billion. | Expected completion in March 2031 |
| Tung Chung West Station | Sun Hung Kai Properties (applicant) | About 1,783 units (9 towers) | Buildable floor area about 764,200 sq ft | Application stage |
Sources: Lands Department press release (2026-05-19), HK01, am730, RTHK, MTR and Town Planning Board documents. Compiled on 2026-10-15. Use the latest official figures for each project.
Feel free to contact me for the latest on new homes in Tung Chung or to ask about a particular development. Ask on WhatsApp Call 5741-0580
Airport City
Airport City and amenities in Tung Chung
Airport Authority Hong Kong’s Airport City expansion is expected to be a major source of increased footfall and commercial activity in Tung Chung.
Earlier reports on 11 SKIES (a 2025 opening, about 40% leased and the previous retail space ratio) have been superseded by the 2026 arrangements. Do not cite them as current. Check Airport Authority Hong Kong’s announcements for the new name and opening date.
Transport
Rail and road links
The Tung Chung Line Extension and Siu Ho Wan Station will provide the main transport links for future developments in Tung Chung East, Tung Chung West and Siu Ho Wan.
Tung Chung East and Tung Chung West stations
Tung Chung East Station is in the Tung Chung East extension area, near Ying Tung Estate and Yu Nga Court. Tung Chung West Station’s entrances and exits are near Yat Tung Shopping Centre and Yu Tung Road, close to Tung Chung Battery, Hau Wong Temple and North Lantau Hospital.
Siu Ho Wan Station
The station is part of the Siu Ho Wan Depot site development (OYSTERBAY). Foundation works were temporarily suspended in July 2025 after settlement was detected during monitoring. Check MTR announcements for progress.
Lifts for pedestrian access in Tung Chung
Local infrastructure still in the planning stage.
Proposed infrastructure works at Ying Hei Road and Tung Chung Waterfront Road
Government documents show proposals for footbridges, cycle tracks and noise barriers around Ying Hei Road and Tung Chung Waterfront Road. The footbridges would be near Yi Tung Road and Man Tung Road respectively. The drawings below are from the government documents; check the latest announcements for updates.
Rail opening dates come from railway information sites and news reports and may not reflect the latest official timetable. Verify with the Highways Department or MTR before making a decision.
Siu Ho Wan
Siu Ho Wan: a major development in North Lantau
The Phase 1 tender closed in early 2023 with only three bids and no award. Check MTR and government announcements for future tender arrangements. Figures for Phase 1 alone (about 1.31 million sq ft and up to around 1,900 units) should not be confused with the totals for all four phases.
Timeline
Tung Chung development timeline
Includes both past and expected milestones. Projected dates may slip.
- May 2026 Airport Terminal 2 opens
- 2026-09-30 Early termination agreement for 11 SKIES announced
- Early 2027 Arts hub expected to begin operating
- 2027-04-01 Proposed handover of 11 SKIES to Airport Authority Hong Kong
- 2028 AsiaWorld-Expo Phase 2 and phased completion of SKYTOPIA
- From 2028/29 Phased operating launch for 11 SKIES alongside SKYTOPIA (Airport Authority Hong Kong’s target)
- December 2029 (expected) Tung Chung East and Tung Chung West stations open
- 2030 (expected) Siu Ho Wan Station opens; target for first residents to move into Siu Ho Wan
- March 2031 Completion date for the Tung Chung Traction Substation project
Long-term planning
Tung Chung East Extension
Based on the Civil Engineering and Development Department’s Recommended Outline Development Plan.
Frequently asked questions
Is there a large supply of new homes in Tung Chung?
Supply is continuing, but schedules, developers and target buyers vary. When viewing properties, compare completion dates and rail links for each development against what you need.
Does handing 11 SKIES back to Airport Authority Hong Kong mean it won’t open?
No. The announcement concerns an early termination agreement. Handover to Airport Authority Hong Kong is proposed for 2027-04-01. The Authority aims to start phased operations from 2028/29 alongside SKYTOPIA. Check its announcements for the details.
Where can I find the latest official information?
Check Lands Department land sale results and the MTR, Airport Authority Hong Kong and Town Planning Board websites. The sections on this page are dated, and I’ll revise them as information changes.
West Kowloon / Kowloon Station Development Guide
Kai Tak Development Guide